← All posts

Does the Length of Task AI Can Do Really Double Every Seven Months? What METR's Own Documents Show

Published November 2026 · 20 min read

Written 27 November 2026. The facts are as of that date. All sources were read on 27 November 2026.

In February 2026 MIT Technology Review called one chart "the most misunderstood graph in AI" (S9). It comes from METR, the organisation that publishes the measurements, and it says that the length of task AI models can complete has doubled about every seven months. On 20 November 2026 METR published a new update that puts the doubling time at 3.61 months, or 110 days. It also says the task suite it rebuilt in January 2026 (TH1.1, a revision of the suite behind the seven-month figure) is saturated: the newest models pass so many of its tasks that it can no longer measure them.

This post tests both figures against METR's own documents and data files: how many tasks there are, how many of them are long, where their human times come from, and how wide the error bars are. METR's best case comes first, in its own words. Nearly every caveat below was raised by METR itself. What this post adds is to put those caveats next to the numbers they qualify, and to show the arithmetic so a reader can redo it.

A few terms first

METR's best case, in its own words

The original blog post (S1, 19 March 2025) says the task length that frontier agents complete at 50% reliability has been "doubling approximately every 7 months for the last 6 years." The authors say they are "fairly confident that the overall trend is roughly correct, at around 1-4 doublings per year." The same passage carries its hedge: estimates depend on "methodological choices like the tasks used and the humans whose performance is measured," and S1 notes "the possibility of substantial model error."

The paper behind it (S2, arXiv 2503.14499) gives the number precisely: "time horizon has doubled every 207 days with a 95% bootstrapped confidence interval 166-240 days" (§3.2).

In January 2026 METR rebuilt its task suite as "Time Horizon 1.1" (TH1.1) and checked whether the trend survived. Its answer (S3): "This hybrid trend shows exactly the same doubling time as the TH1 trend, of 196 days (7 months)." METR also says the TH1.1 doubling time lies within the confidence interval of the earlier version.

The newest update (S8, 20 November 2026) reports a doubling time of 3.61 months, with a 95% CI of 2.08 to 4.94 months, which it equates to 110 days. It adds: "This is similar to the previous TH1.1 doubling trend of 105 days." It also cites an outside check: "recently published data from OpenAI seems to imply a doubling time of 3.8 months when using their models on their own internal research tasks."

That is a strong case. The long-run line has held its value through one rebuild of the task suite, and a second company's internal data points the same way as METR's newest figure.

Three figures, not one

The phrase "every seven months" now refers to one of three figures from three versions of the work. Converting days to months uses one month = 365.25 / 12 = 30.44 days.

Version Doubling time In months Model window
Paper (S2), 2025 207 days, 95% CI 166–240 207 / 30.44 = 6.80 2019 to 2025
TH1.1 (S3), Jan 2026, all models 196.5 days, no interval given 196.5 / 30.44 = 6.46 stitched: earlier-version estimates for models before 2023
TH1.1 (S3), models from 2023 130.8 days, 95% CI 107–161 130.8 / 30.44 = 4.30 2023 onward
TH1.1 (S3), models from 2024 88.6 days, no interval given 88.6 / 30.44 = 2.91 2024 onward
Q4 2026 update (S8), Nov 2026 110 days (3.61 months), 95% CI 2.08–4.94 months 110 / 30.44 = 3.61 recent frontier models

S3's table gives the earlier version's figures beside the new ones. Its rows read: "P50 doubling time | 195.8 days [162, 223] | 196.5 days"; "P50 doubling time, >=2023 | 165.3 days [129, 211] | 130.8 days [107, 161]"; and "P50 doubling time, >=2024 | 108.9 days | 88.6 days".

Seven months is 7 × 30.44 = 213 days. That lies inside the paper's interval (166 to 240) and inside the earlier version's interval in S3 (162 to 223). On its own terms, the long-run claim holds.

To see what the figures mean per year, divide a year by the doubling time, then raise 2 to that power:

S1's "1-4 doublings per year" spans 2^1 = 2 times to 2^4 = 16 times a year. Even the 110-day figure, at 3.32 doublings a year, falls inside the range METR gave in March 2025.

S8's interval converted to days is 2.08 × 30.44 = 63 days to 4.94 × 30.44 = 150 days. The paper's 207 days and TH1.1's 196.5 days both lie outside it. That does not show the 2025 paper was wrong. The two fits cover different stretches of time: the paper runs from 2019, while S8 fits recent frontier models. The comparison shows that the recent rate is faster than the long-run rate. It does not show that the long-run rate was mismeasured.

Test 1: does the faster rate depend on where the line starts?

METR says it does. The paper reports that restricting the fit to 2024 models gave "time horizon doubling about every three months," and it calls extrapolation "not robust" (S2, App. F.1). It also warns that "confidence in the 2024–2025 only trend is low because there are only seven frontier models in this time span" (§5). Comparing 207 days for 2019 to 2025 with 172 days for 2023 to 2025 (fitted without the very short SWAA tasks, described below), the authors write that "this difference is still within margin of error" (App. F.1).

The paper recommends a change-point analysis, a test of whether the slope of the trend changed partway through, but did not run one (App. H.4). This post found no change-point test of the time-horizon trend in the documents it read.

Two gaps stand out in the table above. Two figures in the table have no interval: TH1.1's stitched long-run 196.5 days, and the steepest, 88.6 days since 2024.

S8's own sub-fits also spread widely. On the verifiable part of the new suite alone, S8 reports a doubling time of 1.65 months, with a 95% CI of 0.79 to 3.99 months. It says this could reflect which tasks are in the suite, or "our selection for difficult tasks during development", and it judges selection unlikely to be the main cause. Footnote 52 fits the verifiable subset of the new suite (TH2 verifiable) alone, back to GPT-4o, and says "the doubling time is longer (approximately 3.2 months)." The footnote also says those earlier models are left out of the main trend, and that their fits are "very sensitive" to whether the short (under 10 minutes) TH1.1 tasks are included.

METR does report how well the trend line fits. S1 says the trend "is well predicted by an exponential trend". The paper's Appendix H.1, "Alternative curve fits", says: "In our main result, we fit an exponential curve (linear with a log y axis) because the fit is very good (R²≥0.96, depending on the exact data and methodology)." R² is a measure from 0 to 1 of how closely points follow a fitted curve. The next sentence there is "Linear and hyperbolic curves have poor fits (Figure 15)", and Figure 15's caption is "Linear, hyperbolic, and exponential fits for model time horizon since 2019." So this is a fit of horizon against release date, for 2019 onward. Two other R² figures in the paper measure something else: about 0.80 "when regressing model success rate against the logarithm of human time-to-complete" (§2.3), and Fig. 3's 0.83, a fit of average model success rate against human time. For TH1.1, S3 says only: "The new fit appears slightly less linear, with a slightly lower R^2." It gives no number.

Test 2: what the top of the curve rests on

A time horizon of many hours needs tasks that take humans many hours, with times that were measured. Here is what each version had.

The paper's suite (S2). It had 170 tasks: 97 from HCAST, METR's main set of software and research tasks, drawn from 46 task families; 7 from RE-Bench, a set of machine-learning research tasks; and 66 from SWAA, a set of very short software tasks. 97 + 7 + 66 = 170. The paper gives 169 in other places. It says "148 of the 169 tasks have human baselines" and "we rely on researcher estimates for 21 tasks in HCAST". 169 − 148 = 21, so the counts agree, and 148 / 169 = 88% of tasks had a measured time. The paper reports over 800 baseline attempts: 558 on HCAST and RE-Bench, of which 286 succeeded, and 249 on SWAA, of which 236 succeeded. "Task durations are calculated using the geometric mean of successful baselines." Tasks with no successful baseline got manual estimates (footnote 15).

TH1.1 (S3). It has 228 tasks. "We increased the number of long tasks (estimated to take humans 8 or more hours) from 14 to 31." Then: "It is also notable that we measured human baseline times for only 5 of our 31 long (8h+) tasks." So 31 − 5 = 26 of the long tasks have estimated times, and 26 / 31 = 84%. S3's comparison table has a row "Tasks 8h+, human baselined": 6 for TH1 and 5 for TH1.1. Baselined long tasks went from 6 of 14 to 5 of 31. Long tasks make up 31 / 228 = 13.6% of the suite.

The ceiling. METR's time-horizons page (S5) says: "Measurements above 16 hrs are unreliable with our current task suite." METR's public model data file (S6) carries a comment on its doubling-time field: it "excludes points with central estimate p50 > 16 hrs". In that file, Claude Mythos Preview (early) has a 50% horizon of 1044.8 minutes, which is 1044.8 / 60 = 17.4 hours, so it is left out of the fitted trend. S8 then says: "Within a year, models had saturated the TH1.1 suite, which includes tasks up to 30 hours." Its first footnote: "Recent models would not have a well-defined 50% horizon on TH1.1 alone, having saturated many of its tasks."

The new suite, TH2 (S8). This is why the 110-day figure is fitted on TH1.1 and TH2 combined. TH2 has 36 tasks in 12 families. Eight families are verifiable (optimisation, machine learning, puzzles and games); four are hard to verify or depend on judgment. "Our longest evaluations in TH2 verifiable tasks are run for 48 hours." Formal human baselines were run for 3 of the 12 families, and: "Human baselines are directly used for only 9% of our estimates for how long it takes a human to complete the task." S8 does not say whether the 9% counts tasks or score thresholds. The rest come from "an estimation procedure informed by public records, experts, and extrapolation". S8's Appendix A describes this as researcher estimates, public records (modded-nanogpt records, AltoClef commits, Slay the Spire runs), expert input and extrapolation.

METR is open about this. It calls its trends "fairly robust" to changes in the time estimates, and the estimates themselves "quite speculative". It says: "we used our estimates when we could make reasonable arguments for their feasibility." And: "we are uncertain about the comparability of our baseliners to AI R&D lab employees."

So with each version, the horizon trend leans more on estimated human times. In the paper, 88% of tasks had a measured time. In TH1.1, 5 of the 31 long tasks did. In TH2, 9% of the time estimates come directly from baselines. These are not the same measure in each case, since the TH1.1 figure covers only its long tasks, but they all point the same way.

Test 3: how wide are the error bars on one model?

A trend line is fitted through points, and each point has its own uncertainty. A January 2026 note by METR's Thomas Kwa (S4) says error bars on single models have historically been about a factor of 2 in each direction. S3 calls its intervals still very wide, but says they narrowed: "the upper bound on Opus 4.5 was 4.4X larger than the point estimate with TH1, but it is now 2.3X larger with TH1.1." S3 gives Claude Opus 4.5 at 320 minutes with an interval of 170 to 729. 729 / 320 = 2.28, so the top of the range is 2.3 times the point estimate. S4's sentence continues that error bars are worse for current models like Opus 4.5 as the benchmark begins to saturate.

For newer models the ranges are wider still:

These are S8's standard estimates, and the upper tails are sensitive to how a few task times were estimated. The same S8 table gives alternatives. With altered estimates for the Train a Program and Minecraft Bot tasks, GPT-6 Astra is 29 h (14–946) and Opus 5.5 is 30 h (13–450). With a "4x longer" variant, they are 32 h (13–120) and 29 h (12–111).

The newest models, which carry most weight in any claim of speed-up, are the ones placed least precisely. That fits what METR itself says in S8: the old suite is saturated for recent models, and the new one has 36 tasks.

Test 4: is the 80% line a separate check?

The paper reports that the 80% horizon doubles at a similar rate, 204 days, and that 80% horizons are 4 to 6 times shorter than 50% horizons (S2, §3.2.1). That reads like a second, independent trend. Kwa's note says 20% and 80% horizons are "not fully independent estimates" from the 50% horizon (S4), because there are too few parameters to fit them separately. So the 80% line is not a fully separate check on the 50% line, though the table below suggests it carries some information of its own, about the curve's slope.

The public model file (S6) gives both horizons for each model. Dividing one by the other:

Model 50% horizon (min) 80% horizon (min) 50% ÷ 80%
GPT-4o 6.99 1.27 5.5
o3 119.7 30.0 4.0
GPT-5 203.0 38.3 5.3
Claude Opus 4.5 293.0 49.4 5.9
GPT-5.4 341.7 53.9 6.3
Gemini 3.1 Pro 384.1 89.8 4.3
Claude Opus 4.6 718.8 69.9 10.3
Claude Mythos Preview (early) 1044.8 185.9 5.6

Most ratios sit near the paper's 4 to 6. Claude Opus 4.6 is the outlier at about 10: a 50% horizon of 718.8 / 60 = 12.0 hours, but an 80% horizon of 69.9 / 60 = 1.2 hours. Quoting only its 50% figure would hide that gap. For the new suite, S8 says: "When separated, 80% time horizon doubling times on TH2 (verifiable) appear shorter than on TH1.1." It gives 80% values only in figures, not in its text.

What the tasks are

The horizon measures one kind of work. The paper says: "All tasks we use are automatically scorable" (App. B.2). The tasks involve no other agents, have loose resource limits, rarely punish a single mistake, and take place in environments that "do not significantly change unless directly acted upon by the agent". The paper says the tasks lean heavily toward software engineering and machine-learning research, and that the human baselines are noisy (App. E.4). It scores each task on 16 "messiness" factors. Its finding: "Controlling for task length, we find models perform worse on tasks that have higher messiness scores." It also reports "no evidence of plateaus in performance trends specific to the higher messiness subset." (§4)

Other caveats METR states itself:

Outside critics have made similar points. In MIT Technology Review (S9), Daniel Kang said: "A model can get better at coding, but it's not going to magically get better at anything else." Inioluwa Deborah Raji said: "I don't think it's necessarily a given fact that because something takes longer, it's going to be a harder task." Kwa, of METR, said in the same article: "I think the hype machine will basically, whatever we do, just strip out all the caveats."

So how firmly does the record support "doubles every seven months"?

How to check this yourself

  1. Download METR's model file, https://metr.org/assets/benchmark_results_1_1.yaml, and its task file, https://metr.org/assets/task_results_1_1.yaml. S5 says: "The data and plots on this page are licensed under CC BY 4.0." Neither file states a licence itself.
  2. In the model file, find the 50% and 80% horizons and their intervals for each model. Divide the 50% value by the 80% value to reproduce the table above, and divide each upper bound by its point estimate to see how wide each model's range is.
  3. In the same file, find doubling_time_in_days. Note the comment saying points above 16 hours are excluded, and compare its all_time_stitched and from_2023_on values with the S3 table.
  4. In the task file, the fields are task_id, human_minutes, n_successes, n_runs and task_weight. Count tasks with human_minutes of 480 or more (8 hours); S3 says there are 31.
  5. The analysis code is linked from S5, at GitHub METR/eval-analysis-public.

One limit applies to step 4: the task file has no field saying whether a time was measured or estimated. The counts of estimated times in this post (21 in the paper, 26 of 31 long tasks in TH1.1, and the 91% of TH2 estimates not taken directly from baselines) come only from METR's text. The first two cannot be checked against the public task file, which has no such field. The TH2 tasks are not in the public files at all.

What could not be established

Sources